Synthetic sample for demonstration. Preparation support only; no compliance certification or safety assurance.
SENSE / REPRESENTED OBSERVATION
A path appears in the agreed scope.
Modbus TCP context
SOURCEMaintenance workstation192.0.2.10
DESTINATIONPLC-DEMO-01192.0.2.20 / TCP/502
COLLECTION BOUNDARY
Illustrated packaging-cell switch mirror. Other segments and intermittent traffic are not represented.
Record
What is represented
What remains unverified
E-01 / inventory
PLC-DEMO-01 / 192.0.2.20 / PLC / Modbus TCP
Device identity and firmware
E-02 / flow
192.0.2.10 to 192.0.2.20 / TCP/502
Request type and approved access
ANALYSE / FINDING F-01
Maintenance access approval.
Review required
E-02 represents a communication path. It does not establish approved access or a malicious session. A protocol alone does not establish read-only behaviour.
OWNER & SCOPE
Who authorised this path?
Access owner and permitted destination remain unconfirmed.
OPERATIONAL CONTEXT
Was it an agreed window?
Maintenance timing and session controls remain unconfirmed.
RISK INTERPRETATION
What is the consequence?
No plant-specific likelihood, consequence or risk score has been established.
Invented records. Local browser interaction. No live telemetry.
Example inventory
Start with the device.
Select an example to inspect its declared identity and role.
3 invented assets
PLC-01 · example controller
IP address
192.0.2.20
Declared zone
Control cell A · Level 1
Example protocols
Modbus TCP / S7
Vendor / model
Not assigned in this simulation
Roles and zones are declared for this example. A real installation requires identity and placement review.
Declared example boundaries
Review the communication context.
Purdue levels help explain the example; they do not automatically establish security zones.
Level 3
Engineering
ENG-01 192.0.2.10
Controller writes require an approved maintenance context.
Level 2
Supervision
HMI-01 192.0.2.30
Example HMI-to-PLC write permitted by the declared policy.
Level 1
Control cell A
PLC-01 192.0.2.20
Declared destination for the example command observations.
Two example conduits, two review contexts
HMI-01 PLC-01: permitted in the example. ENG-01 PLC-01: maintenance approval required. These are invented policy assumptions, not a discovered network or a deployed segmentation control.
Run an invented policy example
A command needs context.
Choose a scenario, then run the browser simulation. No traffic is sent or analysed.
No example has been run.
Ready to explore
Run a scenario to inspect the review card.
Observation
Not run
Example policy
Not evaluated
Why it matters
Function codes alone do not establish authorisation.
Generate a snapshot of this example, including scope, scores, owners and open decisions.
Inspect generated report
Presentation prototype. Scores use invented likelihood and consequence values on a 4 × 4 matrix. They are review priorities, not a measured security rating or compliance result. Scheduled delivery, roles and multi-site data integration are not connected in this website preview.
VIOLET HORIZON / INTERACTIVE WORKFLOW PREVIEW
From observation to accountable action.
Inspect the context. Review the boundary. Keep the evidence. Illustrative design examples · no plant connection
See the engineering workspace.
Supplied Command Centre capture · recorded topology and stored alerts, not a live factory feed. Unresolved assets and the unverified current health status are shown as captured. Select the image to inspect it at full size.Recorded asset evidence · identity and placement require site review. Interface styling shown is from the supplied engineering build.
Invented decoded fields, not actual protocol-analyser output. These examples do not establish shipped detection coverage, authorisation or a physical change.
Next step
Check the observation with the asset owner, the approved communications register and the maintenance window. Preserve unknown fields and the review decision.
BOUNDARY REVIEW / ILLUSTRATIVESAVED PLACEMENT · EXAMPLE PATH
Find the boundary. Check the permission.
LEVEL 0 / 1Field & basic control
Sensor-01PLC-01
LEVEL 2Supervisory control
HMI-01SCADA-01
LEVEL 3Plant operations
Historian-01
LEVEL 3.5Industrial DMZ
Access gateway
HMI-01 PLC-01 / example Modbus path
The example has no approved conduit recorded. Check the saved zone assignment and communications policy with the plant owner. Missing approval evidence is not proof of a physical safety violation.
Example placement and relationships. A Purdue level is not a verified physical location, firewall rule or complete inventory.
LOCAL REVIEW SNAPSHOTEXAMPLE PACK / 001
Evidence ready for the next reviewer.
Records
1 synthetic asset · 1 synthetic command
Included context
Time, endpoints, command and review action
Integrity
SHA-256 snapshot checksum
Review status
Human review required
Browser-generated example. No plant data is uploaded.
ILLUSTRATIVE REVIEW REFERENCES
NIS2 Article 21(2)(a)Risk analysis and information-system security
These are prompts for evidence review. A downloaded record does not establish a legal outcome, CAF achievement or certification.
Export scope and references
The working platform exports selected stored metadata as a review snapshot. This website button downloads invented sample data. It does not demonstrate a completed one-click NIS2 or CAF assessment, a packet capture or a digital signature.
Protocol-command and boundary examples are design illustrations. Supported packet-to-alert paths and live capture still require acceptance evidence. View verified engineering progress
YOUR SITE
Move from examples to a scoped evaluation.
DEPLOYMENT
Plan the observation path.
Agree collection, management access and operational responsibilities.